Skip to main content Skip to search Skip to main navigation
0
My collective-request products

No products added yet

Go to collective request


Product information
With the application of the 3 phases L1-L2-L3 and the N conductor, the built-in relay (2 changeover contacts) must pick up and the green LEDs must light up. However, the prerequisite for this is that the voltage does not fall below the setpoint UN 0,85 (type UR 3060). If the rated voltage fails or falls below, or if one or more of the 3 phases or the N conductor fails, the corresponding LED flashes and the relay returns to its rest position. Monitoring in a 1-phase network is carried out with the connections L and N. The failure of one or more phases or the N conductor is indicated by a red, flashing LED. In fault-free operation, these LEDs are green.

Relay Knowledge

Background knowledge on standards, technical terms and the correct selection of relays –\npraxisnah prepared.

Read more

Relay Standards and Operating Conditions

According to which standards are relays manufactured and what needs to be considered regarding installation position, voltage peaks and control? An overview.

Read more

Relay technical terms explained

What do contact set, micro disconnection or the utilization categories AC1 to DC13 mean? The most important relay technical terms at a glance.

Read more